Water stored at the reservoir will need to be treated ready for public supply, before being transferred into Anglian Water and Cambridge Water supply networks.
Treating the water
A new water treatment works will make the water safe for people to drink. This facility includes screens to filter out debris from the water, equipment to remove impurities from the water by adding solutions that make these particles bigger, and then more equipment to filter these out through different screens and materials. The filtered water is then cleaned to make it safe to drink, before being transferred to homes and businesses.
Supplying treated water
Both companies’ 2024 Water Resources Management Plans identify where the treated drinking water should be sent to, for supplying to homes and businesses via our existing network of pipes. The treated water will be transported to each place via a new underground pipeline.
Find out more about the Water Resources Planning process here.
We’ve identified the following water supply infrastructure that would ensure clean water reaches our customers’ taps.
Water Treatment works
A new water treatment works will make the water safe for people to drink. This facility includes screens to filter out debris from the water, equipment to remove impurities from the water by adding solutions that make these particles bigger, and then more equipment to filter these out through different screens and materials. The filtered water is then cleaned to make it safe to drink, before being transferred to homes and businesses.
Anglian Water supply at Bexwell
We’ll transfer treated water from the reservoir to Anglian Water customers via an underground pipeline. This pipeline would be approximately 30 kilometres in length, travelling to a service reservoir near Bexwell, northeast of Downham Market.
Cambridge Water supply at Madingley
We’ll transport treated water to Cambridge Water customers via an underground pipeline. The pipeline would be approximately 45 kilometres long, running south to a connection point and new service reservoir at Madingley, northwest of Cambridge.
Cambridge Water supply at Bluntisham
So we can connect to the other Cambridge Water supply point in Bluntisham, we’re proposing a short pipeline that would spur off from the Madingley route corridor, about halfway down.
Find out more
- You can see the areas of land we’ve identified for our phase two proposals by viewing our interactive map.
- You can find out more information about our proposals for each source by reading our associated water infrastructure proposals document.
- You can find out more about the process we followed to identify preferred options for our associated water infrastructure by reading our Options appraisal report.
Get in touch
Contact the project team today.
Freephone: 0800 915 2492
Email: info@fensreservoir.co.uk
Post: Freepost Fens Reservoir
Useful documents
You can view and download our project documents here
A guide to our proposals and phase two consultation brochure
DownloadPhase two consultation - associated water infrastructure proposals
DownloadPhase two consultation - main site design brochure
DownloadStay up to date
You can keep up to date with the latest project news by:
- Registering for email updates
- Visiting our news page